Back to Overview

The main advantages of breathable plastic runway

2021-10-23


The material used for breathable plastic runway is mainly composed of EPDM rubber, terpolymer of ethylene, propylene and non-conjugated diene, and colored rubber granules. Softness: EPDM plastic material is softer than ordinary plastic material. Athletes are not easily injured when they fall. So what are the main advantages of breathable plastic runway?

Sunlight and corrosion resistance: all day use, will not fade due to UV rays and acid rain pollution. Kindergarten EPDM rubber granule manufacturer can maintain its high quality for a long time. Sensitive mixing of multiple colors: various colors, soft colors, granular surface to avoid the reflection of dazzling light, beautiful and durable, you can choose a variety of shades to match different pictures. Strong abrasion resistance: the abrasion resistance is less than 2.5%, which can meet the needs of campuses at all levels for a long time and high operating frequency. Simple protection: dirt can be removed with water and common cleaners, making it look brand new and saving management costs.

Breathable plastic runway is mainly used for basketball courts, tennis courts, children's playgrounds, athletic tracks and other sports venues. There are a variety of colors that can be mixed at will. Due to its good water repellency, it can be laid directly on the mixed mud foundation. The foundation requirements are not high, the flatness is qualified, and the surface layer can not be sand or powder; compared with the traditional block safety mat, it has the advantages of more beautiful appearance, strong integrality, durability, and simple protection.

For the construction of breathable plastic runway, asphalt concrete or cement concrete can be used for the foundation pavement, which is required to have a certain degree of strength and stability (cement concrete foundation needs to be cut for expansion joints, and the waterproof layer can not be used). Cracks caused by frost damage and uneven frost expansion are strictly prohibited on the runway. The foundation has good flatness and prescribed slope.

The thickness of the material used for the breathable plastic runway is required to be 7mm, and cannot be lower than 3mm. breathable plastic runway construction precautions: the construction temperature is 15-35 ℃, the temperature is too high or too low will affect the construction. The paving tool used (usually called a trowel or push knife). Mixture yao Fully and evenly mixed. Each batch of material should be well connected, otherwise there will be joints if the connection is not good. The ingredients should be strictly proportioned. Primer matting rubber granules: glue = 8:1; usually, no catalyst is needed to be added. If the ambient temperature is lower than 10℃, 5-10‰ can be added appropriately. After the completion of the site, check and clean up the residue on the site to make the whole site beautiful.

Breathable plastic runway in the construction process should pay attention to keep the surface of the foundation always in a clean and dry state, the runway along the sink should be special waterproof treatment. The foundation needs more than 28 days of maintenance period after completion. So as to make the breathable plastic runway suitable for high-speed processing, with anti-puncture and anti-odor function of the advantages of the runway to play.

Request Quote

Let us know your requirement. We will connect best products with you.

SUBMIT