2022-03-10

Is the construction of plastic runway difficult? Plastic runway manufacturers know

With the rapid development trend of economic development, people's living standards continue to improve, rubber runway has long been the standard configuration of many urban colleges and universities. Here let the plastic runway manufacturer take you to see the construction problems of the plastic runway, we will know whether it is difficult or not.   Rubber runway construction problems:   1. Plastic runway manufacturers say that the localized or large-scale bulging of the rubber runway occurs in a short period of time after completion, and even occurs when the rubber runway is basically detached. This situation is mostly related to the foundation negligence, such as the cement mortar ratio is not in place or the moisture-proof primer solution is not in place, resulting in the rise of surface moisture, topping up the rubber runway, resulting in bulging bags.   Solution.   To solve the basic situation, you need to pay attention to the basic moisture content and relative humidity of the air. The humidity of the construction environment is between 30% and 50%. Be able to do sample test before construction. In addition, if the paved playground has a bulge, you can use the laser to cut a part of the bulge, dry and then do the basic moisture-proof liquid, and then smoothed as required.   2. The fixing of the plastic runway is slow, even after the maintenance period is not dry, there is no compressive strength, and there is no high viscosity.   Plastic runway manufacturer said, here are three explanations:   (1) project construction, due to raw material deviation caused by the proportion of dislocation, such as composite rubber track, too many particles, so that the raw material is sticky, and even no compressive strength.   The metal catalyst is not added or the amount added is too small, resulting in a slow reaction or incomplete reaction of the raw materials. This is the profile of winter rubber track construction. In winter, due to the low temperature, the reaction speed of raw materials becomes slower, and the metal catalyst can accelerate the reaction speed of raw materials. The commonly used paint thinner is not enough, and there are other residues, such as aldehydes and water. This causes the molecular structure chain to be blocked when the plastic material is reflected, which prevents the production of polymer materials, or the ratio is out of proportion. Solution.   Before construction, check the scales and pounds for metrological verification to ensure that they meet the requirements; follow the strict requirements of the construction process and carry out the actual operation. Samples should be checked before construction to determine the quality of paint thinner, the quality or amount of metal catalyst to prevent unnecessary damage. Decide whether cleanup and resurfacing is required according to the specific situation.   (2) After the completion of the overall surface layer of the sports field ground layer, the latter process can not be solved sloppily, that is, painting lines on the sports field. Marking the rubber runway is not an easy task. If the construction team does not pay attention to locate the dotted line when drawing the line, it may jeopardize the overall practical effect of the rubber runway.   The solution.   is the procedural process of carving and detailed work. Plastic runway manufacturers say that in addition to ensuring testing instruments, mechanical equipment and special tools, the construction team should also have a strong sense of responsibility and serious work attitude. Measurement accuracy is one in ten thousand, and the steel tape measure used should take into account the metrological verification and changes in the number of feet. After the positioning dotted line is arranged, three people should be reviewed, and the line should be sprayed after the review meets the requirements. Each lane should have a spray box to ensure the symmetry and consistency of the playground slant line. During the whole spraying process, pay attention to clean the bottom box immediately to prevent the sprayed paint from dripping on the rubber runway surface to ensure that the rubber runway surface is beautiful, generous and neat.
View More

2022-02-16

How to design a hybrid plastic runway? What are the elements of hybrid plastic runway construction in the rainy season that need attention?

Nowadays, many hybrid plastic runways are used in schools or residential stadiums. It is evident that this is a trend, as the properties of hybrid plastic runway materials are beneficial to the body and speed of the athletes. So how to design hybrid plastic runway? 1. Wind speed: wind speed has a great impact on the evaporation of diluent, diluent evaporation rate is different will affect the surface quality. Intermediate materials in the construction process always maintain a certain amount of thinner to control viscosity and fluidity. This requires the construction personnel to accumulate experience and match according to the weather conditions of the day. 2. Sunshine intensity: the conservation temperature of the material is very important. Sunlight intensity directly affects the molding temperature of the product. Under high temperature, the material will expand. This requires good control of the construction progress, such as when to start construction in the morning, what process to do at noon, and when to start maintenance in the afternoon.
View More

2022-02-01

Engineering quality and construction safety issues related to hybrid plastic runway

In order to ensure the quality of hybrid plastic runway and construction safety, remind us, in view of the current climate, today, the plastic runway manufacturers to take you to understand the plastic runway construction considerations are as follows!   1. In the hybrid plastic runway construction site set up to the project manager as a high responsible person for the construction of the dry season leading group, the implementation of the planning, method implementation, personnel education, supply of materials and tools, emergency relief and other details. To the main control and related parts, and clear responsible person.   2. Materials and machinery that meet the equipment requirements and can ensure the smooth progress of dry season construction. Set up special power supply line and switch box for on-site construction in dry season, and assign special person to check and maintain the normal operation of special power supply system at any time.   3. Prepare targeted and feasible construction plan of plastic runway in dry season in advance and report it to the owner and supervisory unit for approval. After approval, timely implementation of the program.   4. Site in addition to planning surface water flow according to the natural ground elevation, should also set up a perfect drainage system. Drainage ditches should be dredged and water collection wells should be set up every 20 meters. Catch basins should be equipped with earth retaining equipment and cleaned regularly. On-site drainage should be resolved before it appears on the site so as not to block the municipal drainage system.
View More

2022-01-17

Hybrid plastic runway in the construction of matters to be noted

Hybrid plastic runway will be used in the stadium. Among them, the hybrid plastic runway in the construction to prevent the occurrence of certain shelling, then, the following together to understand the hybrid plastic runway in the construction of matters to pay attention to!   How can I lay hybrid trucks? After the runway paved rubber surface, the reason why there is a local blistering like the signs of shelling, because the runway lower density control is unreasonable. As the runway density needs to be strictly controlled, the asphalt base layer itself is not firmly embedded, the occurrence of shelling and peeling, the runway surface gasification, grass-roots level tearing, and its rubber in the curing before the negative bubbles in the water, thus generating negative bubbles in addition to preventing and controlling rainwater, the sweat of the construction workers also affects the plastic trucks of the rubber curing. Plastic truck builders should have towels ready to wipe sweat when laying in the heat. Please avoid the time of laying paste in the morning when there is high humidity in the atmosphere and in the air. During the construction, the constructor strictly and rationally arranges the processes to ensure the excellence of the project.   The elastic layer at the bottom of the plastic truck is laid by elastic rubber particles and one-component polyurethane adhesive at the ratio of 8:1 through professional construction machinery. After the bottom construction, the bottom surface is closed with special caulking adhesive to prevent the PU face rubber from leaking downward during the construction of the surface layer. The surface layer is painted after mixing the special facial rubber and EPDM particles. Mixed plastic runway adopts the mixed structure approved by the International Land Federation, the surface layer is PU particles or EPDM weather-resistant environmentally friendly color particles, and the mother is part of the full PU co-mingled rubber particles. The construction process is simple and meets international competition standards. The standard thickness is 13mm. Plastic truck use precautions   The main components of hybrid plastic runway are acrylic and high-quality resin, the material is similar to the convenience bag we put food in, to meet the requirements of environmentally friendly surface material.   Hybrid plastic runway is non-toxic and harmless to the environment and human body. It has the characteristics of anti-UV, anti-abrasion, anti-burst, anti-aging, long life, easy maintenance and low maintenance cost.   At present, hybrid plastic runway, plastic field smoothness, high compressive strength, hardness elasticity moderate, stable physical properties in schools, fitness places and other widely used, but its cost is higher than the general runway, the use of the following precautions should be noted   1, hybrid plastic runway paving is completed, maintenance 7 ~ 10 days after normal use.   2, hybrid plastic runway in the case of suitable drainage facilities, can be used throughout the day, can only be used in sports training and competition, not suitable for other purposes.   3, hybrid plastic runway should avoid the pollution of harmful substances and violent mechanical impact and friction. Trucks are not allowed to be loaded with vehicles traveling, heavy and sharp things, etc. Athletes wear special sports shoes or shoes. The length of spikes on sports shoes should not exceed 9 mm. Dancing shoes should not exceed 12 mm. Sports shoes with long nails are not allowed to be used on the plastic runway.   4, hybrid plastic runway avoid organic solvents, chemicals, cigarette butts and other fires, isolate the heat source.   5, the edge of the hybrid plastic runway special protection, shall not be moved at will. When you find the damage and blistering phenomenon of the road teeth, you should notify the construction unit in time to repair, so as to avoid more serious damage.   6, try to avoid the long-term load of plastic trucks, so as not to damage the rubber surface of the truck.   7, keep the plastic runway clean, often rinse with water shower, after rinsing, a small amount of residual water on the rubber surface can be wiped with a dry cloth. Plastic trucks stained with oil, you can use 10% ammonia, detergent, detergent and other scrubbing.   8, winter use of plastic packages. If you encounter rain or snowy weather, clear it as soon as possible. When you find the freezing phenomenon, in order not to damage the plastic runway, you should remove it with hard objects and melt it naturally.   The above introduction is the hybrid plastic runway in the construction of matters to be noted, for more information, feel free to contact us!
View More

2021-12-20

Why is a hybrid plastic runway the right one for schools?

Nowadays, with the development of the national economy, most schools have begun to build sports facilities related to sports events, of which plastic runways are the key to sports facilities. There are five kinds of popular runways in China, which are breathable, composite, hybrid, EPDM and plastic. Campus is not only a place to teach and educate people, but also a place to improve students' comprehensive physical fitness. Generally the campus runway will prioritize the material, elasticity and abrasion resistance of the runway. Hybrid plastic runway is widely used, so hybrid plastic runway can just meet these requirements. Today, I will share with you why hybrid plastic runway is recommended to be used in campus!   Hybrid plastic running track has the following characteristics:1. Elasticity: hybrid plastic running track has proper elasticity, which can give athletes proper rebound force and jointly protect athletes' joints and ligaments to reduce the risk of injury.2. Abrasion resistance: the excellent abrasion resistance of plastic track can ensure the long-term stability of the structure of plastic track, which can be used for running shoes with studs below 7mm.3. Stability: hybrid plastic running track has excellent anti-aging and resistance to salt spray, humidity and heat, ozone, ultraviolet resistance, its internal physical and mechanical properties and appearance of structural properties remain unchanged for a long period of time, thus extending its service life.4, practicality: plastic track can be used for training, games and competitions immediately after a heavy rainfall, or rinsed with a proper drainage system, the use of the performance to remain unchanged.5, anti-skid: the special covering layer of the plastic track ensures the appearance of the non-slippery , to provide athletes with contact stability and safety feeling, to ensure that athletes even in wet conditions and bad weather can step on the feet, fast, safe start, accelerate and run. 6, simplicity: mixed plastic runway in its reasonable use does not require special protection, but daily cleaning and flushing is a must, proper protection can improve its service life.   The material used in hybrid plastic runway is a new type of polymer synthetic material with high strength, good elasticity, good shock absorption, good abrasion resistance, weather aging, anti-skid and other characteristics. The site is easy to clean, maintain and manage, not affected by climatic conditions, and its beauty, brightness and flatness give athletes a good sense of comfort, boost the spirit and improve the level of competition.   Hybrid plastic running track surface thickness uniformity, bright colors, smooth and neat, its elasticity and non-slip performance effectively protect the athletes' leg joints, to avoid accidental injury. Hybrid plastic runway all materials non-toxic, harmless, renewable, conducive to the protection of the environment and human resources. The appearance of plastic sports field cost is high, but its durability and high quality service guarantee greatly reduces the cost of manual maintenance, so this is the reason why many school districts will choose it.
View More

2021-12-03

What are the environmental advantages of breathable plastic runways?

The quality of breathable plastic running track materials has been doubted by many people, so is the current outstanding environmental performance of plastic running track competitive in the relevant market? Today's plastic running track materials are becoming more and more abundant, safe and healthy is considered suitable for public demand. Especially with the much-anticipated environmental performance, compared with the traditional hardening requires the use of heavy metal materials of plastic runway materials, do not know the new plastic runway materials for safety and other aspects do not know how good. In addition, environmental protection hu is now becoming a concept that the country attaches great importance to. Whether it is plastic runway construction or other areas, the key is to produce environmentally friendly logo. The key is that these estimates will be very expensive environmentally friendly plastic runway material actual price is also very pro-people, the construction process is more able to save a lot of material.     And what we say in the mouth of the environmental protection plastic runway material comprehensive input quality is also very good, wear resistance is very good, can be put into use as immediately after the rain, can be said to be the ideal product.   What are the advantages of breathable plastic runway in environmental protection, this question briefly explains the official sports. Now this advances the plastic runway, certainly because of the comprehensive quality is good. So don't keep wondering if the plastic runway is good or not, in the end it is still not environmentally friendly.   Breathable plastic runway is widely used in schools, gymnasiums and other sports fields. Moreover, that is the type of sports ground designated for many professional competitions. A very important factor in the reason it is so popular is its great superiority. It is available all day long. That's what makes him so much more important than other plastic places. It maintains a high level of quality in all seasons and temperature differences, and can be used even more immediately after it rains, increasing the time of use and improving the utilization of the field. It is very elastic and easily absorbed by impact. Plastic running track with proper elasticity and repulsion can reduce physical exertion and improve race performance. In addition, it properly absorbs the impact of the feet, reduces sports injuries, and is suitable for long-term practice and competition.   Breathable plastic runway has strong abrasion resistance and longer service life. The abrasion resistance of plastic runway is less than 2.5%, which meets the requirements of schools at all levels for long time and high usage frequency.   Breathable plastic runway widely used to make our life more colorful, improve the quality of our sports.   Breathable plastic runway has long been widely used in schools and sports venues, with the continuous improvement of the production process, the plastic runway in the performance and other aspects have been greatly improved. The following carefully count the advantages of plastic runway. 1, plastic runway is not because of the weather conditions and affect the use of the storm is also very difficult to bubble and other problems, greatly improving the utilization rate, reducing the late maintenance and maintenance costs.   2, healthy sports can not be separated from healthy products. Plastic runway through professional testing recognized high elasticity and anti-skid performance, can be familiar with a large limit to reduce the impact of the movement on the body, reduce accidental injury.
View More

2021-11-23

What is the difference between a breathable plastic runway and a rubber runway?

Breathable plastic runway and rubber runway are the two runways that are used more often nowadays and are common in daily life. But do you know the difference between plastic runway and rubber runway? Today I will give you an introduction.   First, the difference in materials   Rubber runway is a highly elastic polymer compound made of latex from rubber trees, rubber grass and other plants, with elasticity, insulation, permeability and permeability. It is divided into natural rubber and synthetic rubber. Natural rubber is processed from rubber trees, rubber grass and other plants. Synthetic rubber is made by polymerization of various monomers. Rubber products are widely used in industry and daily life.   The raw material of breathable plastic runway is mainly composed of organic or inorganic elements such as carbon, oxygen, hydrogen and nitrogen. The finished product is a solid, which is a liquid dissolved during the production process. Therefore, melting, pressure moving and cooling hardening can be heated to form various shapes.   Second, the construction method   Usually the rubber runway will be made in advance of the roll and packaged directly to the site, which requires high leveling of the ground.   Plastic runway to be evenly transported to the site construction, the flatness of the ground is not required.   Third, the difference in service life   The normal life of prefabricated rubber runway is more than 10 years. Even if it is more than 4 years, the surface texture is almost unchanged, and it is not easy to be degraded and broken.   The normal life of breathable plastic runway is 3 years. EPDM rubber particles are easy to appear in the anti-skid surface layer, and will fall off, break and wear in the starting section and the first track.   Four, recyclable   Rubber runways are difficult to dispose of at the end of their life, and discarded runway materials cannot be recycled. Incineration and landfill will waste a lot of energy and cause harm to the environment.   Breathable plastic runway can be made of recycled rubber at the end of its service life, greatly reducing the damage to the environment and energy waste.   Fifth, the price difference   Rubber runway mainly use environmentally friendly materials and raw materials, so the price is slightly higher.   Breathable plastic runway consists of polyurethane prepolymer, mixed polyether, waste tire rubber, three-dimensional vinyl rubber particles or polyurethane particles, pigments, additives, fillers, etc., the material is cheaper cost-effective.   Six, the advantages of plastic runway:   1, all-day use: any season and temperature difference can maintain a high level of quality, can be used immediately after the rain, thus increasing the use of time, improve site utilization.   2, elasticity: with appropriate elasticity and rebound, can reduce physical exertion, improve the game performance.   3、Absorption of impact: Properly absorb the impact of the foot, reduce sports injuries, long-term practice and competition are very suitable.   4, weather resistance: due to ultraviolet rays, ozone, acid rain pollution, will not fade, differentiation, softening, can maintain bright colors for a long time.   5, abrasion resistance: abrasion resistance of less than 2.5%, to meet the requirements of schools at all levels of long time, high frequency of use.   6、Compression: it will not be unable to recover the elasticity because of the heavy pressure of the athletic equipment.
View More

2021-11-04

Odor analysis on breathable plastic runways

Many of us like to play sports, run and play soccer on the breathable plastic runways in our schools, but there is always a "smell" that can be detected during the exercise process. Whether it is a new plastic runway or a breathable plastic runway used to some extent, it can give off a certain "smell". Newly built plastic runways certainly smell "better" than old ones. For many ordinary sports enthusiasts, they do not know where this "smell" comes from and whether this "smell" is harmful to our body. So where does this "smell" come from? How does the "toxic" runway form? I will analyze the answer for you one by one. Breathable plastic runway on the source of the odor: (a) poor quality runway materials 1, add excessive toluene, xylene diluent. Breathable plastic runway is the main component of polyurethane, polyurethane is a combination of "dozens of" materials, material composition is complex, most of the polyurethane is a and B of the other components of the chemical substances according to a certain proportion of the reaction to the formation of an elastic material. In the reaction process, the two groups of materials sometimes need to add solvents to adjust the reaction effect, toluene, xylene as an organic solvent dilution, play a role in prolonging the curing speed. 2, banana water (Chinas water), gasoline as a diluent to join. We can see that the main component of banana water is xylene, gasoline contains a certain amount of aromatic hydrocarbons, these substances have an unpleasant odor and toxicity, the thickness of the plastic runway is generally about 10 mm, it is difficult to evaporate, not only is it harmful to the children, but also to the front-line personnel engaged in sports engineering is more harmful. 3, add heavy metal dryer - lead salt. This substance can promote the solidification of the runway stereotypes, but the heavy metal lead will cause pollution. The problem with lead salts is that they are toxic. This kind of poison to the waters, soil environment pollution persists, harmful to the human body. 4、Add phthalate plasticizer The main role of adding o-phenylene plasticizer is to improve the elasticity of the runway to meet national standards, if excessive use of o-phenylene plasticizer, not only is it toxic, the boy can also be sterilized. 5, toluene diisocyanate (TDI) adhesive TDI is a colorless liquid, emitting a pungent and pungent odor, in the plastic runway mainly to increase the tensile force of the runway. With the 5 points above, can you see that they are the only culprits of the "odor" and "toxic substances" on the playground? Are they the only culprits of "toxicity" and "odor" in the playground? (b) Inferior black rubber granules In the type of breathable plastic runway, breathable plastic runway and hybrid plastic runway need to be filled with black rubber granules, artificial grass soccer field also often use a large number of filler granules. Hazardous composition analysis of black rubber particles The composition of black rubber particles is more complex. They are mainly made of waste tires, waste cable skins, rubber conveyor belts, rubber seals, foam shoes, and waste windows. The composition of recycled black particles is more complex. It is the use of waste rubber raw materials for recycling. I don't know how many times it has been recycled, and benzene and toluene have been added to it. These two substances themselves have an irritating odor and toxicity, and with so many black pellets filling the campus playground, the results can be imagined.
View More

2021-10-23

The main advantages of breathable plastic runway

The material used for breathable plastic runway is mainly composed of EPDM rubber, terpolymer of ethylene, propylene and non-conjugated diene, and colored rubber granules. Softness: EPDM plastic material is softer than ordinary plastic material. Athletes are not easily injured when they fall. So what are the main advantages of breathable plastic runway? Sunlight and corrosion resistance: all day use, will not fade due to UV rays and acid rain pollution. Kindergarten EPDM rubber granule manufacturer can maintain its high quality for a long time. Sensitive mixing of multiple colors: various colors, soft colors, granular surface to avoid the reflection of dazzling light, beautiful and durable, you can choose a variety of shades to match different pictures. Strong abrasion resistance: the abrasion resistance is less than 2.5%, which can meet the needs of campuses at all levels for a long time and high operating frequency. Simple protection: dirt can be removed with water and common cleaners, making it look brand new and saving management costs. Breathable plastic runway is mainly used for basketball courts, tennis courts, children's playgrounds, athletic tracks and other sports venues. There are a variety of colors that can be mixed at will. Due to its good water repellency, it can be laid directly on the mixed mud foundation. The foundation requirements are not high, the flatness is qualified, and the surface layer can not be sand or powder; compared with the traditional block safety mat, it has the advantages of more beautiful appearance, strong integrality, durability, and simple protection. For the construction of breathable plastic runway, asphalt concrete or cement concrete can be used for the foundation pavement, which is required to have a certain degree of strength and stability (cement concrete foundation needs to be cut for expansion joints, and the waterproof layer can not be used). Cracks caused by frost damage and uneven frost expansion are strictly prohibited on the runway. The foundation has good flatness and prescribed slope. The thickness of the material used for the breathable plastic runway is required to be 7mm, and cannot be lower than 3mm. breathable plastic runway construction precautions: the construction temperature is 15-35 ℃, the temperature is too high or too low will affect the construction. The paving tool used (usually called a trowel or push knife). Mixture yao Fully and evenly mixed. Each batch of material should be well connected, otherwise there will be joints if the connection is not good. The ingredients should be strictly proportioned. Primer matting rubber granules: glue = 8:1; usually, no catalyst is needed to be added. If the ambient temperature is lower than 10℃, 5-10‰ can be added appropriately. After the completion of the site, check and clean up the residue on the site to make the whole site beautiful. Breathable plastic runway in the construction process should pay attention to keep the surface of the foundation always in a clean and dry state, the runway along the sink should be special waterproof treatment. The foundation needs more than 28 days of maintenance period after completion. So as to make the breathable plastic runway suitable for high-speed processing, with anti-puncture and anti-odor function of the advantages of the runway to play.
View More

2021-10-08

Outdoor plastic running track use points

Compared with ordinary concrete or asphalt roads, outdoor plastic running track is more suitable for walking and running. Plastic has good elasticity and anti-slip properties, which can effectively protect athletes' leg joints and prevent accidental injuries. Running has some damage to the knee joints, and long-distance running will bring a lot of pressure to the knee joints. Outdoor plastic running track is soft and elastic, which can cushion the leg pressure very well.   Training in such an environment can greatly reduce the probability of knee injury. Accidental falls are inevitable when exercising, and hard surfaces can cause injuries, while the flexibility of outdoor plastic runways will reduce the injuries to a lower level. Plastic is made of materials such as polyurethane rubber, which is flexible and shock-absorbing to ease the impact of each step. It is an internationally recognized material for outdoor sports fields.   Outdoor plastic runways are afraid of being stepped on by sharp, hard objects such as spikes and high heels. These shoes can easily wear through the runway. In addition, flammable objects such as cigarettes with sparks can also damage the outdoor plastic running track. Therefore, in order to enjoy the good time of jogging on the outdoor plastic running track for a longer time, do not wear shoes with sharp and hard objects such as pointy shoes, high heels, etc., and do not bring flammable objects into the running track to avoid damaging the outdoor plastic running track.   Outdoor plastic running track absorbs impact and reduces the shock to your body, making your knees, ankles and bones less prone to injury while running. If it is a concrete floor, the impact will be directly on our body and it is easy to damage our body!   Outdoor plastic running track is smooth and flat, shock-absorbing and free bouncing. When athletes fall, the degree of injury can be reduced. In addition, it has the characteristics of anti-skid and elasticity, and can be properly adjusted according to the hardness of the site. In recent years, it has become more and more popular in parks and schools, and is also popular among sports people. As a matter of fact, silicone is transparent and its color is automatically adjustable. Why are all outdoor plastic running tracks red?   This is mainly thanks to the principles of heat and aesthetics. Objects only absorb colored light that is different from their own color, and red light is reflected away when using a red track. If the white color is particularly dirty and unsightly, the light reflection seriously affects the eyesight, the construction of outdoor plastic runway is generally used iron red, orange red, ochre red. In addition, outdoor plastic runway near the green lawn and plants, red and green is also beautiful.   In order to better use and extend the service life of outdoor outdoor plastic runway, it is recommended to carry out routine maintenance and repair of the playground from the following aspects:   1. After the outdoor plastic runway is laid, it should be maintained for 7-10 days before use;   2. outdoor plastic runway in the case of certain drainage facilities, suitable for all-day use; in addition to athletes training, competition and student sports fitness exercise, shall not be diverted to other uses.   3. Avoid the pollution of harmful substances and keep it clean frequently;   4. Avoid violent mechanical impact and friction, and do not allow vehicles to drive on the runway;   5. Athletes wear special sports shoes, with nail lengths generally not exceeding 7 millimeters, and jumping shoes generally not exceeding 11 millimeters; 6. Avoid loading and stacking heavy and sharp objects for a long time, etc.. Thus avoiding deformation and damage of the surface layer and loss of elastic stress; 7. Isolate heat sources and avoid contact with organic solvents, chemicals, cigarettes and other fires and pollutants;   8. Spray with water frequently for cleaning, the small amount of residual moisture on the rubber surface after cleaning can be absorbed by the dry mop;   9. Avoid oil stains, wipe with 10% ammonia or detergent or laundry detergent as soon as possible;   10. The edges of the outdoor plastic runway should be protected and should not be tilted at random. If damage or blisters are found, professionals should be notified in time for repair.
View More

2020-09-27

Characteristics of ecological plastic runway

Plastic runway according to its construction structure, materials can be divided into: prefabricated components of plastic runway, plastic runway, ecological plastic runway, composite plastic runway, hybrid plastic runway, breathable plastic runway, EPDM plastic runway six categories. Plastic runway is also known as all-day soccer sports playing field, it is composed of polyurethane material prepolymer, mixed and methacrylate, waste tire rubber, EPDM vulcanized rubber granules or PU granules, color paste, modifier, filler. Ecological plastic runway with good flatness, high tensile strength, strength ductility moderate, smooth process performance characteristics, beneficial to the full play of the rate and technicality of the players, reasonably enhance the fitness sports test scores, reduce the rate of falls and injuries. Plastic runway to take safety protection measures, it can be very good to reduce the sportsman sports injury, composite plastic runway features: 1. hybrid plastic runway color: special polyurethane particles, soft surface color, granular surface layer, to prevent the reflection of sunlight, beautiful and long-lasting, and can be used with multi-color. 2. Economy: Convenient maintenance, save governance spending. 3. Safety: It can reduce the sports injuries caused by the fall of sportsmen. 4. Adhesion: special construction treatment, strong adhesion, can hold down the rise of moisture, no blistering, no peeling and other phenomena. 5. Eco-plastic runway flatness: construction using self-leveling materials, the surface is flat, in line with the requirements of particularly flat competition venues. 6. Impact resistance: with a strong elastic layer and buffer layer, can absorb strong impact, the surface will not be damaged. 7. Spike Resistance: In the 100 meter starting point, which is the most heavily used, it will not be damaged by spiked shoes or starting frames. 8. Abrasion resistance: not due to the heavy pressure of track and field equipment and can not restore the elasticity. 9. Eco-plastic runway abrasion resistance: abrasion resistance is less than 2.5%, to meet the needs of all levels of schools and universities for long periods of high-frequency use. 10. Impact absorption: moderate absorption of foot impact, reducing sports injuries, long-term training and competition are appropriate.
View More

2020-09-24

How to maintain eco-plastic runway in summer?

In order to make the ecological plastic runway service life longer, not easy to appear breakage phenomenon affects the use of plastic runway, so no matter what the season is to carry out proper maintenance of plastic runway, then in the burning hot summer hybrid plastic runway what maintenance methods? First, clean up the water left by the movement in a timely manner, prohibit the ecological plastic runway immersed in stagnant water, although some of the ground selection of waterproof rubber spacing water, but a long time of immersion, will also seriously affect the service life of the plastic runway. Cleaning process in a timely manner with a water absorber to suck the sewage dry, after cleaning a small amount of residual water on the surface of the glue can be wiped away with a dry cloth. Stained with oil can be 10% ammonia or detergent, washing powder scrub clean. Second, avoid smoke and fire and isolate the heat source, avoid breathable plastic runway contact with organic solvents, chemicals, cigarette butts and other fires, pollutants, etc., by diesel pollution and corrosion of the root part of the firmly dug out, fill in with glue. Third, athletes in the ecological plastic runway after the activities, sweat or drinks spilled on the plastic runway, site maintenance personnel to shovel the site in a timely manner on a variety of dirt and stagnant water. Fourth, should pay attention to fire prevention summer climate is very hot, dry, to avoid ecological plastic runway fire, plastic runway in the conditions of a certain drainage facilities, adapt to all-weather use. Eliminate flammable items into the plastic runway, prohibit hard, rough cleaning utensils to avoid sharp objects bumped into the ecological plastic runway. Fifth, on the high traffic, plastic plastic runway wear and tear of the local should shorten the protection cycle, pay attention to the margins, shall not be arbitrary lifting, such as the discovery of the road teeth damage, blistering phenomenon should be timely to allow the construction unit to protect, remember to prohibit vehicles driving on the runway, piling up heavy and sharp objects.
View More

2020-07-01

Why are fully plasticized plastic runways so popular?

With the rapid development of China's economy and the improvement of people's living standards, more and more people have begun to pay attention to physical exercise, especially in the past decade, the concept of health has been deeply rooted in people's hearts, and more and more people are keen to maintain their health through exercise. As a result, many schools and stadiums are paying more and more attention to the infrastructure of their venues. Here, I will tell you about the all-plastic plastic runway. All-plastic plastic runway is made of SPUE material, which is a new type of environmentally friendly material with high strength, high elasticity, wear-resistant and weather-resistant. It adopts new environmentally friendly raw materials and fine processing requirements for precision production. It is not only safe, but also can well meet the needs of sports. The abrasion resistance of SPUE plastic surface material is 20 times that of C60 concrete, and the tensile strength and elongation are far more than 10 times that of the national standard.SPUE is not only of good quality, but also has a long service life, which is more than three times that of similar high-quality plastic materials. SPUE material contains no solvents, zero chlorine paraffin, zero benzene and its cognate compounds, no TDI, no toxic or heavy metal substances, the product is environmentally friendly and clean. It has passed the national 19 items of heavy metal environmental protection test, is a real safety and environmental protection products. All-plastic plastic runway product adopts all-plastic structure, does not contain any impurities, more environmentally friendly and more stable. Single-component solvent-free material, does not contain chlorinated paraffin, MOCA, toluene diisocyanate, solvents and other harmful substances, non-toxic and tasteless, safe and environmentally friendly. Compared with the traditional runway materials, the abrasion resistance of all-plastic plastic runway surface is 20 times that of C60 concrete, the tensile strength and elongation is 10 times that of the national standard, and the service life is more than 3 times that of other high-quality products. It not only slows down the impact on each joint of the human body when the athlete lands, but also enables the human body to obtain stable positive kinetic energy.
View More

2020-06-23

Plastic runway manufacturers: how to construct plastic runway in various situations

For the construction of plastic runway conditions, although not very harsh, but also should pay relative attention to some matters, such as can not meet water, or debris will affect the quality. If you encounter these emergency situations during construction, what should we do?   1. Rain: in the plastic runway construction process suddenly rain, first of all, should immediately stop the ingredients, and then use the pre-prepared plastic film to cover the motor, mixer and material barrels and so on. If the mixer has been stirred in the slurry should be immediately poured into the slurry in the car, when the garbage disposal.   2. windy: in the plastic runway construction process windy, the same place should first immediately stop batching, paving process. If you find that there are debris scraped into the slurry or on the liquid surface, the debris should be constantly removed.   3. Power failure: If power failure is found during the batching process, first check whether the circuit can be repaired in time, if it can be, then it should be repaired immediately, if it can not be repaired in time, stop batching immediately. At the same time, notify the paving process to prepare for the shutdown, if the mixer has material should be disposed of garbage, pay attention to these plastic runway construction matters to ensure that you can use the process in the future can be a better experience.   Hebei Tianyou Sports Facilities Co., Ltd. can undertake all kinds of modern sports venues and facilities construction, professional laying of various types of plastic runway, artificial turf and various types of stadium surfaces, sales and installation of various types of ancillary facilities in the stadium, the company since its inception, "continuous innovation" is the fundamental survival and development of the enterprise, the strong technical force to make the enterprise every year, new products into the market. New products into the market, there are now dozens of products for customers to choose from, but also according to user needs for design, construction.
View More

2020-06-20

Plastic runway manufacturers: plastic runway renovation need to pay attention to what?

With the increase in the use of time, plastic runway degranulation and small area damage is inevitable, so plastic runway manufacturers believe that for the renovation needs of users, to understand the relevant plastic runway renovation points of attention is necessary.   First of all, the professional and technical personnel according to the spot survey or photo observation of the damaged condition of the plastic runway. Generally speaking, the total area of damage is small, the damage condition is light only must be simple to the structural layer of the plastic runway paved again, and in the case of more serious damage must be the overall basic repair up.   Secondly, the sports field before renovation should be resolved to unnecessary dirt, that can ensure the bonding of polyurethane materials and plastic structural layer of the thin thickness of the proportionality, after the construction team will be able to carry out the sports field pavement construction, painting and other processes, in order to ensure that the sports field of the actual effect of the repair, should be the plastic running track all places closed up, and hang up the warning signs.   Finally, after renovation and repair of the sports field must be maintained 7-10 days before it can be delivered for use. In this whole process when to pay attention to the plastic runway water sprinkler equipment, enhance the ductility of the plastic runway pavement.   The above is a summary of some of the problems that need to be paid attention to the renovation of plastic runway, I hope to be able to help you. If there is a need to contact us at any time, we are a professional plastic runway manufacturers!
View More

2020-06-08

Properties of hybrid plastic runway

Nowadays, the country's economic development, most of the schools have begun to build sports programs related to sports facilities, including plastic runway is the key to sports facilities. So today we will talk about the school runway which runway is more suitable.   Now the prevalence of domestic runway generally have breathable, composite, hybrid, EPDM type, and all plastic type of these five categories. Campus is not only a place to teach and educate people, but also a place to improve the general physical fitness of students, the general campus runway will be prioritized in the selection of runway materials, elasticity, wear-resistant and other aspects to consider. The scope of application of hybrid plastic runway is very wide, and hybrid plastic runway can just meet these requirements.   Hybrid plastic running track has the following characteristics:   1. elasticity: hybrid plastic runway has the right elasticity, can be a proper rebound force on the athletes, together with the protection of athletes joints and ligaments, reduce the risk of injury.   2. abrasion resistance: the outstanding abrasion resistance of the plastic running track can ensure that the structure of the plastic running track is stable for a long time, and can be applied to running shoes with spikes below 7mm. 4. stability: the hybrid plastic running track has a proper elasticity to the athletes.   4. stability: hybrid plastic runway has excellent anti-aging and resistance to salt spray, heat and humidity, ozone, ultraviolet function. Inherent physical and mechanical properties and the appearance of structural features remain constant, extending its service life.   5. Practicality: plastic runway is all-weather runway, with proper drainage system, after heavy rain or washout can also be used immediately for training, competition and games, and its performance remains unchanged.   6. Anti-slip: The special cover layer of the plastic running track ensures that its appearance is not slippery, providing athletes with a safe feeling of contact and stability. Even in wet conditions and bad weather can also ensure that athletes feet solid, start, accelerate, run fast and safe.   7. Simplicity: hybrid plastic runway in its reasonable use without special protection. But daily cleaning, flushing is necessary, proper protection can improve its service life.   Mixed plastic running track surface layer thickness uniformity, bright color, flat cut, outstanding elasticity and anti-skid, can effectively protect the leg joints of the sportsman, to avoid accidental injury. All materials used are non-toxic, harmless and regenerative, beneficial to the protection of the environment and human resources. The appearance of plastic sports ground costs more, but its durability, coupled with quality service guarantee, therefore greatly reducing the cost of labor maintenance, so this is the reason why many campuses will choose it.
View More

2020-06-05

Plastic runway manufacturers: what to pay attention to when using plastic runway materials?

Plastic running track material has been used more in our life, especially in many large playgrounds and sports fields, do you know what to pay attention to when using plastic running track material? At this point, our plastic running track material manufacturer will do a simple analysis for you.   1, plastic stadium has a certain drainage facilities, can be adapted to all-weather use. The ceiling height or minimum obstacle should be at least 7 meters, and the main application of hybrid plastic track is the semicircular area in outdoor track and field.   2, plastic track material is only used for sports training competitions, shall not be used for other purposes, the bottom layer is laid by special paving machinery, completely by PU (polyurethane) adhesive and special rubber particles mixed.   3, athletes must wear special sports shoes, the length of the nails should not exceed 9 mm, jumping shoes generally should not exceed 12 mm, if the sports shoes with longer nails, it is not allowed to use in the plastic running track material; machine cross spraying secondary surface spraying particles.   4, plastic runway material paving is completed, need to maintain 7-10 days to use, all levels of competition, school teaching and training runway venues should be concentrated in the midpoint of the center line.   5, the edge of the plastic runway material should be protected, not arbitrary lift, if found damaged, should be repaired immediately. Its role is to reduce the length of other competitions by 4 meters under the control of the ballclub.
View More

2020-06-02

Plastic runway manufacturers: large stadium laying plastic runway should pay attention to what?

Large sports venues are very troublesome to pave, used to use fine gravel to pave, to prevent the site after the rain is too muddy, but also will be more tidy, and gravel construction cost is relatively low, can be used in large areas. If the site is very large, gravel can save a lot of money, paving construction is also much more convenient, but there are also disadvantages, once the injury will be very serious, the greater the amount of sports, the more danger, so there will often be athletes injured, light rubbed skin, heavy also easy to fracture, etc., athletes in such a field activities should be extra careful, but also affects the game to play.   Now large sports venues, many have begun to pave plastic runway, looks more neat and beautiful, bright colors. And the service life of the plastic runway is long, strong abrasion resistance, will not be easy to wear out, athletes can move around at will, and long-term use is not easy to be bad, and do not have to worry about ultraviolet damage to it. The surface layer of the plastic runway is made of rubber, so this aspect can be completely at ease, after paving can be used for a long time, maintenance is not particularly difficult.   So what should I pay attention to when laying plastic runway in large sports venues? First of all, we should consider whether the manufacturer is equipped with professional construction personnel, if you just buy their own materials to lay, may not find a professional construction team, then finally laid into the plastic runway, may not be as expected. Plastic runway in the laying of a lot of attention, especially the larger the area, the more attention to each link, a link is not good, it is easy to affect the overall use of the effect and aesthetics.       Plastic runway in paving, the site must be cleaned up first, there can not be debris, some large particles should be cleaned up in a timely manner, if there are uneven potholes in the area, but also to pad the leveling of some of the paving can begin, and at the same time to ensure that the site is dry, just after the rain is not suitable for laying a plastic runway site to be naturally dry can be.      Each layer of plastic runway material paving, should check the leveling, only each layer is kept level, the final runway will be level, when used will be much more convenient, runway paving is also not immediately used, to wait until thoroughly dry and hardened, but also let the smell dissipate, so that athletes in the use of the safety of the time.
View More

Any Questions?
Get In Touch.

We Can Recommend Suitable Products According To Your Needs.

Request Quote

Let us know your requirement. We will connect best products with you.

SUBMIT