Nowadays, many hybrid plastic runways are used in schools or residential stadiums. It is evident that this is a trend, as the properties of hybrid plastic runway materials are beneficial to the body and speed of the athletes. So how to design hybrid plastic runway?

1. Wind speed: wind speed has a great impact on the evaporation of diluent, diluent evaporation rate is different will affect the surface quality. Intermediate materials in the construction process always maintain a certain amount of thinner to control viscosity and fluidity. This requires the construction personnel to accumulate experience and match according to the weather conditions of the day.

2. Sunshine intensity: the conservation temperature of the material is very important. Sunlight intensity directly affects the molding temperature of the product. Under high temperature, the material will expand. This requires good control of the construction progress, such as when to start construction in the morning, what process to do at noon, and when to start maintenance in the afternoon.

3. Temperature effect: Temperature determines the rate of chemical reaction. High temperature resistance, fast response; if the temperature is low, the reaction will be slow. When the temperature is high, adjust the amount of catalyst appropriately, so that the reaction rate and construction speed synchronization. For example, the hybrid rail sandwich expands too fast and reacts too slowly. All the mud flows to the bottom, resulting in material waste. At the same time, the bottom layer will lose its elasticity due to the increase of filler.

Temperature also directly affects the viscosity of the material and the quality of construction, so the amount of thinner should be adjusted according to the temperature. The evaporation rate of the thinner is determined by the temperature, and the evaporation rate of the thinner directly affects the surface effect.

If you are laying hybrid plastic runway how to design? s time happens to catch up with the rainy season, in order to ensure the quality of the project and construction progress, you need to take the following construction precautions?

1. Establish a rainy season construction team at the hybrid plastic runway construction site. The project manager is responsible for the main control department and related departments, as the person responsible for the implementation of the plan, measures, personnel education, supplies, emergency relief, etc., to determine the responsible person.

2. In order to ensure the smooth progress of construction in the rainy season, adequate materials and equipment are provided, and the site is set up with special power lines and lock boxes for rainy season construction, and special personnel are required to maintain the normal operation in the rainy season. There is always a dedicated power system.

3. Prepare targeted and feasible rainy season construction plan in advance and report it to the owner and supervisory unit for approval. After approval, the program content should be implemented in a timely manner.

4. In addition to the surface water plan for the natural height of the ground, a complete drainage system is established. Drainage ditches should be kept free and water collection wells should be set up every 20 meters. Water catchment wells should have retaining facilities and be cleaned regularly. Sedimentation should be carried out before site drainage to avoid clogging the municipal drainage system.

5. The site drainage system should be intact to ensure smooth drainage so that the site roads are not sunken, slippery, waterlogged or soillogged after rain.

6. Receive and collect weather forecasts and related information at any time, and try to avoid pouring concrete on rainy days. In case of heavy rain during concrete pouring, stop pouring immediately, dispose of the waste in time, and cover the poured concrete immediately.

7. Outdoor small and medium-sized machinery should be set up with canopies or rain shelters as required; the distribution box should be sensitive and effective, capable of preventing rain and leakage, and the insulation of the lines should be checked regularly.

8. Important structural parts should be covered with plastic film to prevent storm erosion and concrete pouring.

9. Hybrid plastic runway construction site set up materials or warehouse should also implement the above rainy season construction measures. The roof should be protected from rain, and the warehouse with moisture-proof requirements should be protected from rain.

10. Before the rain, check the concrete warehouse, material warehouse drainage control, problems in a timely manner.

11. Measure the water content of sand and gravel at any time during the rainy season, grasp the scope of change, and adjust the water consumption in time.

12. Take the project manager as the main, set up the rainy season construction team and flood rescue team, and take all kinds of accountability measures. Adjust the construction arrangement in time according to the climate change to ensure the construction quality and safety.

 Hybrid plastic runway is a prefabricated, flexible, recyclable rubber mat designed to provide temporary protection for the runway surface. It is laid over an existing runway or track surface to protect the surface from cleats, spikes, motor vehicles and people.