Plastic runway manufacturers: plastic runway sublayer to be treated in this way!

2020-05-19


Plastic runway in the choice of good materials, the first thing to do is to do the construction of the bottom layer, because only this one is done, the latter work can be normal to cast open. So how to deal with this bottom layer? The following TECS sports to introduce some of the steps of the bottom layer construction program.

  First, deal with the process

  1, plastic runway bottom layer paving, in the non-dry solid before the mixing of black sealing rubber are poured on the road surface, with a special type of asphalt paver, according to the design of the conception of the thin thickness of the mechanical equipment leveling and tamping, in order to manipulate the use of the amount of and the thinness of the thickness.

  2, plastic runway bottom layer paving the whole process, paving staff to ensure that the equipment walking rate is proportional. Crimping staff to posture skillful, immediately on the leakage of the bottom, concave to carry out the replenishment of glue, protruding position scraping, edge neat and flat, crimping staff not less than a few.

  3, paving and other black sealant after drying, the whole field to carry out inspection. Found that the bottom edge is not flush or have convex and concave place, to carry out cutting, sanding and polishing, make up glue and refurbishment solution to ensure that the surface of the rubber pavement of the thin thickness.

  Second, the precautions

  1, maintenance construction site

  Plastic runway construction site near as much as possible to set up engineering enclosure, to ensure that the gear wind, blocking soil, blocking people, engineering enclosure itself to have credibility and reliability.

  2、Clear the site

  Try to remove the construction site stock basic surface of the residue sediment. If there are all volatile organic matter oil stains, try to thoroughly multi-directional removal.

  3、Maintenance of the current construction works

  With tape stick in the bottom engineering construction work intersection surface, cause the maintenance of the efficacy, so that it is not easy to suffer from the environmental pollution of the natural environment of engineering construction, the first thing should be taken into account the factors that should be taken into account, such as not to destroy the surrounding facilities, how can we build this bottom better.

  The above is God bless sports for everyone to bring about the "plastic runway bottom layer processing process and considerations" content, I hope to be able to help you!