Back to Overview

Plastic runway manufacturers: plastic runway renovation need to pay attention to what?

2020-06-20


 

With the increase in the use of time, plastic runway degranulation and small area damage is inevitable, so plastic runway manufacturers believe that for the renovation needs of users, to understand the relevant plastic runway renovation points of attention is necessary.

  First of all, the professional and technical personnel according to the spot survey or photo observation of the damaged condition of the plastic runway. Generally speaking, the total area of damage is small, the damage condition is light only must be simple to the structural layer of the plastic runway paved again, and in the case of more serious damage must be the overall basic repair up.

  Secondly, the sports field before renovation should be resolved to unnecessary dirt, that can ensure the bonding of polyurethane materials and plastic structural layer of the thin thickness of the proportionality, after the construction team will be able to carry out the sports field pavement construction, painting and other processes, in order to ensure that the sports field of the actual effect of the repair, should be the plastic running track all places closed up, and hang up the warning signs.

  Finally, after renovation and repair of the sports field must be maintained 7-10 days before it can be delivered for use. In this whole process when to pay attention to the plastic runway water sprinkler equipment, enhance the ductility of the plastic runway pavement.

  The above is a summary of some of the problems that need to be paid attention to the renovation of plastic runway, I hope to be able to help you. If there is a need to contact us at any time, we are a professional plastic runway manufacturers!

Request Quote

Let us know your requirement. We will connect best products with you.

SUBMIT